→ Irrigation Restoration Work


ABSTRACT

Name of Irrigation Zone

No. of Works

Estimated Cost
(PKR in Million)

Bahawalpur 11

143.51

D.G.Khan 45

240.55

Faisalabad 3

4.20

Lahore 2

5.50

Head Barrages 20

637.00

Multan 8

8.475

Sargodha 10

88.63

Grand Total: 99

1,127.86



Source: Irrigation & Power Department Last Updated: 16-09-2010

Bahawalpur Irrigation Zone
FLOOD DAMAGED RESTORATION WORKS - FLOODS 2010
SNo.

Name of Work

  Physical  Progress
RAHIM YAR KHAN CANAL DIVISION  
1. Damage of Minchin Flood Bund RD.135-140 Near Chohan Village

90%

2. Spur No.1 Minchin Flood Bund Near Chachran Town

100%

3. Spur No.2 Minchin Flood Bund Near Chachran Town

100%

4. Strengthening 2nd, 3rd & 4th Defence Bund as per design Parameter of Minchin Flood Bund

60%

5. Protection & Strengthening of Chachran Link Bund

80%

   KHANPUR CANAL DIVISON  
6.  Protecting Minchin Flood Bund RD 63-122 during Exp. High Flood 2010

 100%

DALLAS CANAL DIVISION  
7. Closing & Strengtheing Breaches at RD.76 toTail of Bhong Disty.

70%

8. Restoration of Flood Damaged Mazari Disty. RD.0 to 8

70%

9. Closing & Strengtheing Breaches of Left Marginal Bund of Guddu Barrage

100%

10. Restoration of Flood Damage Minchin Bund from RD.435 to 438

90%

11. Purchasing Reserve Stock of sone at Spur No.1, 1-A, 2 & Guide Bank on Minchin Bund.

25%


Note: 1. The progress is based on information received from field staff.
2. The progress of remaining flood works will be intimated and updated on receipt from field staff.

Source: Irrigation & Power Department Last Updated: 28-09-2010

Faisalabad Irrigation Zone
FLOOD DAMAGED RESTORATION WORKS - FLOODS 2010
SNo.

Name of Work

  Physical  Progress
1. Closing Cut at RD.83-84/L Marh Chiniot Drain made by the inhabitants of the right side of the Drain

100%

2. Closing Cut at RD.75-76/L Marh Chiniot Drain made by the inhabitants of the right side of the Drain

100%

3. Closing mishap at RD.88-89/R Pharang Drain

100%


Note: 1. The progress is based on information received from field staff.
2. The progress of remaining flood works will be intimated and updated on receipt from field staff.

Source: Irrigation & Power Department Last Updated: 28-09-2010

Head Barrages Irrigation Zone
FLOOD DAMAGED RESTORATION WORKS - FLOODS 2010
SNo.

Name of Work

  Physical  Progress
MAIN EMBANKMENT  
1. Protection of Shahwala Groyne and its allied river training works during flood season 2010

90%

2. Protection of LMB from RD 80 to 134+500 in Workshop Sub-Division during flood 2010

90%

3. Protection of LMB from RD 0 to 80 in H/Works Sub-Division during flood 2010

90%

4. Supply of Flood Fighting material and providing watching establishment in Workshop Sub-Division during flood 2010

90%

5. Supply of Flood Fighting material and providing watching establishment in Headworks Sub-Division during flood 2010

90%

6. Supply of Flood Fighting material and providing watching establishment in Bund Sub-Division during flood 2010

90%

7. Protection of Spur No.5 U/S Right Taunsa Barrage during flood 2010

80%

8. Protection of J-Head Spur No.1 U/S Right Taunsa Barrage during flood 2010

80%

9. Protection of Guide Head Spur No.1-A U/S Right Taunsa Barrage during flood 2010

80% 

10. Closing breach between RD.32-40 of LMB during flood 2010

40%

11. Protection of guide Head Spur RD.22+500 Maggasan Branch.

80%

12. Protection of J-Head Spur No.2-A U/S Right Taunsa Barrage during flood 2010

85%

13. Protection of J-Head Spur Pirhar Gharbi D/S Left Taunsa Barrage

80%

14. Protection of T-1 Spur U/S Left Taunsa Barrage during flood 2010

70%

15. Protection of T-2 Spur U/S Right Taunsa Barrage during Flood 2010

80%

16. Protection of Spur No.1 D/S Left Taunsa Barrage at RD.12 Maggason Branch

0%

17. Protection of Spur Bait Qaim Wala D/S Left Taunsa Barrage

25%

   
MAIN CANALS  
18. Closing Breaches of T.P. Link Canal from RD.0-35/L & R.

70%

19. Strengthening Right Bank of Muzaffargarh Canal RD.6-9 & providing Plug Bund RD.1+500 for relief cut in common Bank of TP Link and Muzaffargarh Canals

85%

20. Misc. works by Government Machinery

30%


Note: 1. The progress is based on information received from field staff.
2. The progress of remaining flood works will be intimated and updated on receipt from field staff.

Source: Irrigation & Power Department Last Updated: 28-09-2010

Dera Ghazi Khan Irrigation Zone
FLOOD DAMAGED RESTORATION WORKS - FLOODS 2010
SNo.

Name of Work

Physical Progress

RAJANPUR CANAL DIVISION  
1. Temporary Restoration of Dajal Branch RD.144-145/L

100%

2. Raising of Right Bank of Qadra Canal RD.207-220/R to protect the Qadra Canal of Super Highway from Hill Torrent Flood

100%

3. Raising road level from Bagh Sar Town to Murghai Town

100%

4. Closing the breaches of Link No.III RD.194-195/L and RD.224-225 caused by Indus River Flood

75%

5. Closing the breaches of Embankment of Fukhar Minor RD.1-2, RD.13-16 caused by Indus River Flood

45%

6. Raising of Right Bank of Raj Disty. to protect Rajanpur City.

100%

   
D.G. KHAN CANAL DIVISION  
7. Clearing /Desalting of Super Passage of Sori Lund x-ing at RD.69+100 of D.G.Khan Canal and D.G. Khan Canal between RD.68+200 to 70+200

86%

8. Closing /Strengthening breaches on D.G. Khan Dajal Branch and Link No.I Branch due to Flood of Hill Torrent

100%

   
JAMPUR CONSTRUCTION DIVISION  
9. Protecting & Flood Fighting of Ganda Jhakhar Imam

100%

10. Protecting & Flood Fighting of Jampur Flood Bund RD.0-20

100%

11. Protecting & Flood Fighting of Jampur Flood Bund RD.20-40

100%

12. Protecting & Flood Fighting of Jampur Flood Bund RD.40-64

100%

13. Protecting & Flood Fighting of Jampur Flood Bund RD.64-100

100%

14. Protecting & Flood Fighting of Banuhan Disty (Studs)

56%

15. Protecting & Flood Fighting of Rojhan Flood Bund RD.0-10 in city area

100%

16. Protecting & Flood Fighting of Fakhar Flood Bund

100%

17. Protecting & Flood Fighting of Qalandar Shah Groyne

66%

18. Protecting & Flood Fighting of Laskani Flood Bund

62%

19. Protecting & Flood Fighting of Ganddan Flood Bund

60%

20. Protecting & Flood Fighting of Rojhan Flood Bund RD.16+000-61+250 in city area

100%

21. Protecting & Flood Fighting of Ring Bund, J-Head Spur and Rojhan Flood Bund RD.10-16

100%

22. Raising top level of Link No.1 RD.138-203 in different reaches

100%

23. Deploying 8 No. Excavators for enhancing capacity of drains

100%

24. Protective measures for safety of Malkani Spur

75%

   
MUZAFFARGARH CANAL DIVISION  
25. Closing /Strengthening relief cuts at RD.419-20/L of Rangpur Canal and diverting the flood to River Chenab during flood 08/2010 in Khangarh Canal Sub Division

62%

26. Closing /Strengthening relief cuts at RD.435-436/L of Rangpur Canal and diverting the flood to River Chenab during flood 08/2010 in Khangarh Canal Sub Division

45%

27. Closing /Strengthening relief cuts at RD.0-1/L of Muzaffargarh Branch and diverting the flood to River Chenab during flood 08/2010 in Khangarh Canal Sub

85%

28. Closing /Strengthening relief cuts at RD.4-5/L of Muzaffargarh Branch and diverting the flood to River Chenab during flood 08/2010 in Khangarh Canal Sub

66%

29. Closing /Strengthening breach at RD.172-173 of T.P. Link Canal during Flood 08/2010 in Khangarh Canal Sub Division Muzaffargarh

85%

30. Protecting Stone Stud No.13000 along Khanwah Flood Bund in Jatoi Canal Sub Division

30%

31. Protecting Stone Stud No.15000 along Khanwah Flood Bund in Jatoi Canal Sub Division

80%

32. Closing/Strengthening breach in between RD.96-97 of Chander Bhan Flood Bund in Shehr Sultan Canal Sub Division, Ali Pur

60%

33. Closing/Strengthening breach in between RD.56-57 of Chander Bhan Flood Bund in Shehr Sultan Canal Sub Division, Muzaffargarh

90%

34. Closing/Strengthening breaches at RD.230-232/R and RD.230-232/L of Muzaffargarh Canal during the flood 08/2010 in Muzaffargarh Canal Sub Division

50%

35. Closing/Strengthening breaches at RD.239-240/R of Muzaffargarh Canal during the flood 08/2010 in Muzaffargarh Canal Sub Division, Muzaffargarh

85%

36. Closing /Strengthening relief cuts at RD.55-56/R of Shehr Sultan Flood Bund during flood 08/2010 in Shehr Sultan Canal Sub Division Ali Pur

25%

   
KOT AUD CANAL DIVISION  
37. Closing/Strengthening breaches of Muzaffargarh Canal at RD.14150/R, 15350/R

60%

38. Closing/Strengthening breaches of Muzaffargarh Canal at RD.26650 to 27200/L

Work in progress

39. Closing/Strengthening breaches of Muzaffargarh Canal at RD.53750 to 53865/L

100%

40. Closing/Strengthening breaches of Muzaffargarh Canal at RD.61802 to 61980/L

100%

41. Closing/Strengthening breaches of Muzaffargarh Canal at RD.61600 to 62300/R 95%
42. Closing/Strengthening breaches of Muzaffargarh Canal at RD.167 to 168/R

95%

43. Closing/Strengthening breaches of Muzaffargarh Canal at RD.194 to 195/L

65%

44. Closing/Strengthening breaches of Muzaffargarh Canal at RD.194 to 195/R

45%

45. Closing/Strengthening breaches of Muzaffargarh Canal at RD.67 to 68/R

35%


Note: 1. The progress is based on information received from field staff.
2. The progress of remaining flood works will be intimated and updated on receipt from field staff.

Source: Irrigation & Power Department Last Updated: 28-09-2010

Multan Irrigation Zone
FLOOD DAMAGED RESTORATION WORKS - FLOODS 2010
SNo.

Name of Work

  Physical  Progress
1. Restoring apron of right guide bund RD.2000-4500 Trimmu Barrage 95%
2. Repairing Rain Cut and Gharah along Rangpur Flood Bund RD 260-318

95%

3. Closing outlets + filling gharas on Akbar Minor/Flood Bund.

99%

4. Repairing Rain Cut and Gharah on flood bunds in Shujabad Sub Division. 98%
5. Repairing Rain Cut and Gharah on flood bunds in Binda Sub Division + protection RD 50-51 C.F.B. 99%
6. Repairing Rain Cuts and Gharahs on LMB Sidhnai Barrage

95%

7. Repairing Rain Cuts and Gharahs on RMB Sidhnai Barrage

98%

8. Repairing & maintenance of breaching sections on RMB Sidhnai Barrage

99% 


Note: 1. The progress is based on information received from field staff.
2. The progress of remaining flood works will be intimated and updated on receipt from field staff.

Source: Irrigation & Power Department Last Updated: 28-09-2010

Sargodha Irrigation Zone
FLOOD DAMAGED RESTORATION WORKS - FLOODS 2010
SNo.

Name of Work

  Physical  Progress
1. Flood Fighting on Left Marginal Bund of Jinnah Barrage

100%

2. Closing Breaching section on Right Marginal Bund

100%

3. Repairing of damaged pannels at RD.82500 Main Line Upper 100%
4. Repairing of 3 No. stuck up gates of Jinnah Barrage 100%
5. Closing cut and breaching in Canal Colony Protection Bund

100%

6. Protection Farrukhpur Flood Bund betweenn RD 31000 - 32000 from erosion of river Chenab

100%

7. Protecting restoring & back extention of shank of inverted Hockey spur and providing sloping stud U/S of inverted hockey spur near village Bari

75%

8. Inverted Solid Hockey Stud at RD 58+050 of Bhakkar Flood Bund

97%

9. Protecting & Restoring of J-Head Spur Chakori

87%


Note: 1. The progress is based on information received from field staff.
2. The progress of remaining flood works will be intimated and updated on receipt from field staff.

Source: Irrigation & Power Department Last Updated: 28-09-2010