→ Status of Roads
FLOOD EMERGENCY CENTER P&D DIRECTORATE POSITION OF ROADS IN PUNJAB 

SNo.

Name of Road Flood Affected Road Sections/Kms Traffic Condition
1.
Jatoi to Karam Dad Qureshi
District Muzaffargarh
Km 59-60 (Near Shah Jamal) Road open for traffic.
2.
Khangarh Shah Jamal Road
District Muzaffargarh
Km 6 to Km 16 Road opened for all kind of traffic.
   3.  
Metalled Road Chotian Sharif to Aman Ullah District Multan Km 2.50
Road Breached (Near Gardez Pur)
Road open for traffic.
  4.  
Mettalled Road from Shujabad branch to Aamb Wala District Multan Km 1.50: Road Breached and water stagnant (Near Suraj Miani)

Road open for traffic.

  5.  
Mettalled Road from Sher Shah Flood Band to Basti Bhakri Length = 2.75 Km District Multan Km 2.75, Road Breached and water stagnant (Near Mouza Sher Shah) Road open for traffic.
6. 
Chund Massan to Pir Kot Sadhana road, Length 25.50 KM District Jhang Km 23 to Km 25.5
Water flowing in breached portion
Road open for traffic.
7.
Adda Rind to Bait Bat Wala
Length = 14.35 KM, District D.G. Khan
KM No. 8
Flood breached the road at down stream of flood bund of Ghazi Ghat.
Road open for traffic.
8.
Budha Dhola Rayya Road Length 15 KM District Narowal
KM No. 8
Road Breached length 40 Rft
Road open for traffic.

9. 

Lahore Sargodah Mianwali Bannuu Road Art; 2 from Km NO 267.37 to 409.26 L = 141.89
District Mianwali


a) Mianwali - Kalabagh Section.

b) Kalabagh to Essa Khel upto
Provincial Boundary
KM 379 to 381 (Jhalar) Water passing 1 ft.

Road open for traffic.
 10.  
Mettalled Road Nawan Shaher to Kurrey Wala District Multan

Km 1.50
Water lowered Down on  cause way(Near Nawan Shaher )
Road open for traffic. 

11.

Jinnah Barrage Link road Length 7.70 Km.
District Mianwali
Jinnah Barrage to Kot Chandana near Kalabagh Road open for traffic.
12.
Muzaffargarh to Mondka Shah Jamal Road
District Muzaffargarh
Km10,11,12,13,14 & 15
Road cut in Km 12,13,& 14 width 250 150 150 ft.
Road open for traffic.
13.
Wasanday Wali Dewala Road
District Muzaffargarh
Km 3,4,8,11
4 No. Road cut
Road open for traffic.
14.
Mianwali Muzaffargarh road
 Km.262 near Sultan Colony
2-3 ft. Flood water over topped the road
Road open for traffic.
15.
Kot Chutta to Drahma Length = 21.00 KM,
District D.G. Khan
KM No. 19
6 inches water over topped and breached the road
Road open for traffic.

16.
N-55 (Trimin) Distry No. 25 to Shahdiwala
Length = 12 Km District D.G. Khan
Km 0 to 6
Flood water breached the road at different five locations
Road open for traffic.

17.
Vehova to Mithawan U/c Vehova
Length 9.85 KM District D.G. Khan
Km 2,5 and 6
Flood water breached the road 200 Rft damaged in km 3
Road open for traffic.

18. 
Dajal to Miranpur via Tibbi Solgi road
Length = 19 KM District Rajanpur
Numerous breaches/road crust and bridge/culverts are damaged. Road open for traffic.
19.
Indus Highway to Noorpur via Kotla Rubait road Length = 14.00 KM District Ranjanpur Km No. 1
  1.5 to 2 Ft. water in causeway
Road open for traffic.
20.
Chak Shaheed to Bakharpur road Length = 12 KM,
District Rajanpur
Km 1 The road crust breaches and berms damaged. Road open for traffic.
21.
Jalapur to Fatehpur road and extension from jalalpur to Indus Highway Length = 19.36 KM, District Rajanpur KM No. 6
1.5 to 2.5 ft. water in causeway
Road open for traffic.
22.
Aqilpur to Bait Sountra Length = 15.67 km
Distrcit Rajanpur
Km No. 15
Flood water 3" overtopped the road.
Road open for traffic.
23.
Soon Miani Bhung to Iabal Abad (Kacha Razi Road) Rojhan Length = 5.70 km District Rajanpur KM 0.00 to 5.7
Flood Water 1' overtopped the road.
Road open for traffic.
24.
Fazilpur-Hajipur (Dhundi Adda) road to Mud Haji Haibtan Length = 4 km District Rajanpur
KM No. 1
Flood water 6" overtopped and breacherd the road
Road open for traffic.

25.
Rajanpur Kashmore road Mile 38 (Tower Chowk) to Rojhan city Length = 8.00 km District Rajanpur. KM No. 4
Flood water damaged the culverts / berms
Road open for traffic.
26.
Rahim Khan Petroleum Indus Highway to Railway Crossing via Basti Rind Sakhi Length = 8.00 km District Rajanpur.
KM No. 1
Flood water damaged the culverts / berms of the road.
Road open for traffic.

27.
Qasba Kin via Basti Faqir Muhammad Khird Basti Faiz ullah Taibrani Sawalijat Taura Lunjwani Piran Ditta Bhatti Length = 3.50 km District Rajanpur
KM No. 2&3
Flood water 6'' & damaged the culverts / berms of the road
Road open for traffic.

28.
Rajanpur-Muhammadpur Gum wala Bmp Post Length = 6.75 km Disrict Rajanpur
KM No. 1 & 2
Two cuts made by irrigation Department to protect the Rajanpur City.
Road open for traffic.

29.
Noorpur Nawan Shahir U/c Noorpur Manjhu wala Length = 5.10 km, District Rajanpur.
KM No. 2 & 4
6" water overtopped and breached the road.
Road open for traffic.

30.
Rajanpur-Kashmor Road Mile 38 to Uzman via Bhundo Wali Length 13.50 KM District Rajanpur
Km. 0.00 to 9
flood water about 9 inches overtopped the road
Road open for traffic.

31.
Indus Highway to Dera Sardar Amin Khan Mazari Length = 5.00 KM
District Rajanpur
KM 0.00 TO 5
Flood water damage the berms
Road open for traffic.
32.
Indus Highway Mile 29 to Basti Bhorra Lunjwani on the Right Bank of Tariq Minor Length = 8.00 Km District Rajanpur Km 0.00 to 4
Flood water damaged the berms
Road open for traffic.
33.
Hajipur to Nawan Shahir Length 9.00 Km District Rajanpur
 Km 5
9” water overtopped and breached the road 
Road open for traffic. 

34.
Sadiqabad - Kashmore road Length = 35.00 KM
District R.Y.Khan.


Dauwala to Switra km. No. 21.50 to 35.00
Road cut developed about 25 ft. in Km. 33
Water Overtopped at KM No. 27.4 to 28.8
Road open for traffic.
35.
Road from Bye pass Fateh Pur Tiwana to Ehsan Pur (Length: 2.50 Km) District R.Y Khan
Km 1.00
Flood Water overtopped and damaged the Road
Road open for traffic.

36.
Road from Adabpur Chak No. 49/NP to Basti Bhattian (Length: 0.40Km) District R.Y Khan Flood water overtopped the entire length of the road Road open for traffic.
37.
Road from Basti Taj Muhammad Nehaya to Haveli Sayedan (LengthL 2.70 Km) District R.Y Khan Flood water overtopped the entire length of the road Road open for traffic.
38.
Road from Basti Semeja to Bhong - Dauwala alongwith Sui Gas Line (Length 2:00 Km)
District R.Y.Khan
Flood water overtopped the entire length of the road
Road open for traffic.

39.
Bridge near Head Fazil Over Bhong Canal & approach Road (Length : 1.00 KM) District R.Y.Khan Flood water overtopped the entire length of the road Road open for traffic.
40.
Road from Basti Khawaja Mian Mazhar Ahmed road to basti Shabbir Ahmed Shah Mouza Chohan Laiquatpur (length 0.62 Km) District R.Y.Khan
Km 0.32 to 0.62
Flood water overtopped the entire length of the road
Road open for traffic.

41. 
Road from Dera Faridi road to 16/22 Adda Nazimabad (Length 0.79 Km) District R.Y.Khan Flood water overtopped the entire length of the road Road open for traffic.
42.
Road from Basti Pehlwan to Basti Jam Manzoor (Length = 0.9 Km) District R.Y.Khan Flood water overtopped the entire length of the road Road open for traffic.
43.
Road from Mian Akmal Sheikh Riyaz Abad to Basti Dingra Malook Shah via Asghar khird alongwith repair of Bridge over Bhong Canal (length 4.00) District R.Y.Khan Km 3 to 4
Flood water overtopped the entire of the road
Road open for traffic.

44.
Gulehra Gali to Patriata Rest House. Murree Km 7-10 Road open for traffic.
45.
Metalled Road Bagrian to Labhaijy Wala Length KM No. 0 to 3 District Multan KM 3 Road open for traffic.
46. 
Bagrian to Labhaijy Wala Length KM No. 3 to 4 District Multan KM 1 Road open for traffic.
 47.  
Metalled Road Bagrain to Labhaijy Wala Length KM 4 to 6 District Multan
KM 2
Under water
Road open for traffic. 
 48.  
Mettalled Road Bagrain Bund to Basti Gondala Sharif via Chotian Sharif, District Multan Km 0.25
Bagrain
Road open for traffic. 

Source: Communication & Work Department Last Updated: 23-09-2010

Punjab Information Technology Board Email: floodrelief@punjab.gov.pk
© 2010, Punjab Information Technology Board
Developed by: HOSPEX Consulting Services
          PDMA  Urban Unit